Once the project plan is confirmed and ordered, Shunxin machinery will provide the drawings for the composting design and machine layout. Warehouses for the material composting area and fertilizer production area can be built according to our project suggestions.

Based on how the machines work for each process, it usually needs 4~5 people to operate a powder fertilizer production line and 6~8 people to run a granular one. If you have a different plan for the project workforce, you can arrange the manpower accordingly.

Most fertilizer processing equipment from Shunxin machinery can be controlled either by electricity or as customized. The power consumption can be calculated according to the matched machine models as suggested. Clients can make preparation for the power supply.